We have neglected this project for several months. First we had our Tiki 30 to get ready for the Wooden Boat Show in Mystic. Then Liberty yachts had us put a bunch of exterior teak on their new 45' walk around fishing boat and then we had a very large teak deck job on a 190' super yacht at Bay Ship & Yacht in the San Francisco bay to complete. But now we are back on this project "con gusto".When we started this interior we really poured the coal on and the builder has been delayed waiting for the motors so we are still on schedule. The next steps are to fit all of the door and drawer faces into the holes. Here is the galley with its' cubby compartments out board and cabinets underneath.
This photo is of the base for the dinette table.The table leg is a piece of 6" pvc that will be veneered and permanently attached to the table top. The aluminum angles below the hole are for a bolt to go through the bottom of the leg to secure the table while permitting removal for refinishing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment